SATURDAY, SEPTEMBER 23, 2023 AT 8 AM – 4 PM
HIGH WATER rafting on the Kennebec River Turbine Test Release Dates!
Only 4 scheduled releases per rafting season! If you love whitewater action, you will want to be on one of these special release trips… 8,000 cubic feet per second (cfs) water flows, nearly DOUBLE the Kennebec River’s normal whitewater rafting release volume. During a turbine test, Brookfield Power tests the generating turbines by releasing the maximum amount of water possible through the turbines at Harris Station Dam.
Learn more about Kennebec River Turbine